Dimensions

The F.E.A. or Inlet level (IL) dimension in the pumping station is decisive in the choice of your pumping station for an underground installation outside a building.

Depth of inlet (FEA) Type of effluent Recommended lifting station Our advice
200 mm Residual or washing water Star 150
Water lifting for garage outlet
800 mm Treated or raw waste water Star 700
Upstream or downstream installation
from a private sanitation sector
2 ILs available
1250 mm Treated or raw waste water Star 710

 

Motifs décoratifs pour les contenus

The operating principle

Pump operating principle

Normal operating cycle : when the water rises in the tank and reaches level 2, the fl oat switch activates the pump. When the level drops to level 1, the control box stops the pump. If level 3 is reached, the (optional) alarm fl oat activates a visual and sound signal that warns of an overfl ow risk.